Onsite Protection and Control Drawing Verifications: Ensuring accuracy and reliability of protection and control schematics.
Red Line Mark-Ups: Precise documentation updates for technical drawings and revisions.
Online Protection Relay Settings Downloads: Efficient retrieval and analysis of protection relay settings files, events and disturbance records.
Protection Relay Setting Comparison Reports: Comprehensive reports to identify discrepancies and optimize relay performance.
Baseline Study Reports: Detailed assessments with recommendations based on audit findings for improved system reliability.
Condition Assessment Reports: In-depth evaluations of asset conditions to guide maintenance and performance enhancements.
Outage Planning: Coordinating with customers, BoP contractors, transmission utilities, OEMs, and other relevant stakeholders to ensure a seamless outage process.
Pre-Outage Inspections: Conducting comprehensive inspections, including partial discharge testing and thermography, to assess the condition of equipment before the outage.
Finalizing Outage Scope of Work: Defining both scheduled and additional tasks to be completed during the BoP outage, ensuring clarity and preparedness.
Execution of Outage Work: Completing all scheduled and additional works as planned, maintaining focus on quality and efficiency.
Post-Outage Follow-Up: Collaborating with BoP contractors to compile and review the BoP report.
Final BoP Report Submission: Delivering a comprehensive report detailing all activities and outcomes of the BoP outage for client review.
HV Outage Planning
Switching Sheet writing, review and approval
Onsite HV Switching
Recipient In Charge and Sanction For Test Duties
HV Operating Authority Works
Secondary Isolations
Overcurrent Protection
Earth Fault Protection
Voltage Protection
Frequency Protection
Motor Protection
Busbar Differential Protection
Transformer Differential Protection
Insulation Resistance
Polarization Index
Contact Resistance
Interlock and Scheme
Insulation Resistance
Contact Resistance
Timing
Coil Minimum Voltage Pick up
Protection Trip and Functional and Interlock Verifications
Insulation Resistance
Winding Resistance
Ratio
Knee Point (CT Excitation)
Burden
Insulation Resistance
Winding Resistance Ratio
Burden
Tan Delta / DLA
Insulation Resistance
Polarization Index
Winding Resistance
Ratio
Capacitance & Dissipation Factor (C&DF)
Tan Delta / DLA
Tap Changer Analysis
Oil Sampling and Analysis
Insulation Resistance
Polarization Index
Continuity
Sheath Integrity
VLF
Tan Delta
Offline and Online Partial Discharge (PD)
Earth Grid Impedance
Earth Continuity
Earth Potential Rise
Fault Loop Impedance
Cable Screen Integrity